"Solar for Everyone"

Installation Process

"Solar for Everyone"

1.) Open An Account

After your happy with current design proposal, rates, and savings upon your approval you will be emailed 3 documents for you to docusign an open account to get the process moving forward..
  • Open Account with funder
  • Bank ACH for monthly withdrawals
  • Interconnection Agreement for Utility

2.) Schedule Site Survey

After documents are signed we will have to schedule a site surveyor to come to your home and check electric panel, load capacity, roof structure, and shade factor. Once approved they will let us know the buildable condition of install along with any upgrades if needed.
3.) Home Improvement Contract
After Site Surveyor visits your property they will write a report on the buildability of project. This is where you will be emailed final docusign by the installer notifying you of any changes or adders to original agreement and made aware of any cost change or rate increase due to cost of additions needed if any.
4.) Welcome Call
Once the site survey doc is signed the banker/funder for the project will be reaching out to you and go over everything discussed to protect you. They will ask you questions about the deal and make sure your aware of the install, rate approval, any escalators, payment term, etc. At this point your work is finished and the build process starts.

5.) Engineering, Permitting, Installation, Inspection

Engineering
Your project is handed off to the design engineering team for panel placement on slope and electrical wiring diagram for approval. Time Frame: 1 week
Permitting
We apply for all permitting with local municipality for install, interconnection with utility, and state government for approval. Time Frame: 4 Weeks
Installation
Installation for solar normally takes 1 day and if need a roof that will take 1 day as well. We have all deliveries made couple days prior. Time Frame: 1 day
Final Inspection
After installation Municipality sends out their inspector to approve all electrical wiring to be signed off and allowed for operation. Time Frame: 2 weeks

6.) Final Step

Permission to Operate - PTO

Permission to operate is final step after the utility comes to home and changes out meter to reverse or net meter so you get solar credits. When meter is changed out system is turned on and you have now gone solar for big savings and benefits.
Whole Process Takes 2 to 4 Months to Complete

Congratulations YOU WIN !

Frequently Asked Questions
Address:
Cambridge Court Toms River, NJ
Contact:
585-261-5653 Text
LennySolar4x@gmail.com
© Copyright 2023 Network Solutions, LLC. All rights reserved. All registered trademarks herein are the property of their respective owners.

We use cookies to enable essential functionality on our website and analyze website traffic. For more information, read our Cookies and Privacy Policy.

Your Cookie Settings

We use cookies to enable essential functionality on our website and analyze website traffic. For more information, read our our Cookies and Privacy Policy below.

Cookie Categories
Essential

These cookies are strictly necessary to provide you with services available through our websites.

Analytics

These cookies collect information that is used in aggregate and in an anonymized form to help us understand how our website is being used and how effectively our site is performing.